Many contractors request our services for installing ducts, optical fiber lines, electric cables and other procedures that require lateral movements on the side of the structures. At La Gabelle Hydro-electric dam, the electrician contractor mandated to the project retained our services since it was the quickest and most cost-efficient way to provide access to the side of the dam to install the required wiring. For this project, the J-110/35M unit was the most suitable machinery to use because of its size and the speed of its mobilization.